- [ PROTOCOLS:MSTD-1780-TESTS.DOC ] [ 4/88 ]
-
- DCEC PROTOCOL LABORATORY
- FILE TRANSFER PROTOCOL (FTP)
- MIL-STD-1780
- CERTIFICATION TESTS INDEX
-
- This Certification Tests Index provides information on the
- derivation, organization, and function of tests specified for FTP
- within the DCEC Protocol Laboratory.
-
- This document is divided into five sections:
-
- FTP TRACEABILITY INDEX;
- FTP TESTS INDEX;
- FTP CODES INDEX;
- FTP TEST SCENARIOS INDEX;
- and FTP SCENARIOS AND TESTS DESCRIPTIONS.
-
- --------
-
- FTP TRACEABILITY INDEX: FTP TEST NUMBERS versus FTP MIL-STD-1780
- References...
-
- The table shows, for MIL-STD-1780, the FTP Test Numbers which may
- be regarded as the "principal tests" of each required function,
- operation, option, mode, response, or state.
-
- --------
-
- FTP TESTS INDEX: FTP TEST NUMBERS versus FTP Commands/
- Primitives/Options/Modes...
-
- The table shows the FTP Test Numbers which may be regarded as the "principal
- tests" of each FTP Command or Primitive and/or Option or Mode.
-
- --------
-
- FTP CODES INDEX: FTP TEST NUMBERS versus FTP Response Codes...
-
- The table shows the FTP Test Numbers which may be regarded as the
- "principal tests" of each FTP Response (or State, etc.) Code to/
- for/of the indicated FTP Commands or Primitives.
-
- --------
-
- FTP TEST SCENARIOS INDEX: FTP TEST SCENARIO FILES versus FTP
- TEST NUMBERS...
-
- The table shows, for each FTP Test Number, the UNIX filenames of
- the FTP test Scenario Files in which it may be regarded as a
- "principal test objective".
-
- --------
-
- FTP SCENARIOS AND TESTS DESCRIPTIONS...
-
- This section provides a brief narrative of the scope and
- objectives of each FTP test Scenario File and a narrative or
- graphic operational description of each FTP Test Number.
-
- FTP -1-
- FTP TRACEABILITY INDEX
-
- FTP TEST NUMBERS
- versus
- FTP MIL-STD-1780 References
-
- The following table shows, for MIL-STD-????, the FTP Test Numbers
- which may be regarded as the "principal tests" of each required
- function, operation, option, mode, response, or state. Test
- Numbers not indicated here may be used to establish necessary
- predecessor conditions for these tests.
-
- Reference Test Number
- --------- --------------------
-
- 5.7.1.1.1 1, 60, 117
- 5.7.1.1.2 1, 61, 117
- 5.7.1.1.3 1, 62, 117
- 5.7.1.1.4 3, 63, 108
- 5.7.1.1.5 2, 64
- 5.7.2.1 32, 65
- 5.7.2.2 31, 65, 116
- 5.7.2.3, 5.7.2.4, 5.7.2.5 18, 19, 20, 50, 51,
- 52, 53, 54, 55, 112,
- 113, 114
- 5.7.3.1, 5.7.3.2 9, 66, 115
- 5.7.3.3 24, 67, 118
- 5.7.3.4 10, 68
- 5.7.3.6 25, 69, 107
- 5.7.3.7 26, 70, 107
- 5.7.3.8 4, 71, 105
- 5.7.3.10 20, 72, 102
- 5.7.3.11 21, 73, 106
- 5.7.3.12 22, 74, 110
- 5.7.3.13 23, 75, 111
- 5.7.3.14 7, 76, 101
- 5.7.3.15 6, 77 104
- 5.7.3.16 5, 78, 103
- 5.7.3.17 8, 79, 200
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- FTP -2-
- FTP TESTS INDEX
-
- FTP TEST NUMBERS
- versus
- FTP Commands/Primitives/Options/Modes
-
- The following table shows the FTP test numbers which may be
- regarded as the "principal tests" of each FTP command or
- primitive and/or option or mode. Test numbers not indicated here
- may be used to establish necessary predecessor conditions for
- these tests.
-
- Command or Primitive Option or Mode Test Number
- -------------------- -------------- --------------------
-
- USER 1
- PASS 1
- ACCT 1
- REIN 3
- QUIT 2
- PORT 32
- PASV 31
- RETR 9
- STOR 9
- MODE BLOCK 18
- MODE COMPRESSED 19
- MODE STREAM 20
- TYPE ASCII 18, 19, 20
- TYPE EBCDIC 18, 19, 20
- TYPE IMAGE 18, 19, 20
- STRU FILE 18, 19, 20
- STRU RECORD 18, 19, 20
- APPE 24
- ALLO 10
- RNFR 25
- RNTO 26
- ABOR 4
- DELE 20
- CWD 21
- LIST 22
- NLST 23
- SITE 7
- STAT 6
- HELP 5
- NOOP 8
-
-
-
-
-
-
-
-
-
-
-
-
- FTP -3-
- FTP CODES INDEX
-
- FTP Test Numbers
- versus
- FTP Response Codes
-
- The following table shows the FTP test numbers which may be
- regarded as the "principal tests" of each FTP response (or state,
- etc.) code to/for/of the indicated FTP commands or primitives.
- Test numbers not indicated here may be used to establish
- necessary predecessor conditions for these tests.
-
- Response Code Command or Primitive Test Number
- ------------- -------------------- -----------
-
- 120 REIN 63
- (125/150)6(226/250) RETR, STOR, APPE, LIST, NLST
- 66, 67, 74, 75
- 200 PORT 65
- ALLO 68
- RNTO 70
- DELE 72
- CWD 73
- SITE 76
- NOOP 79
- TYPE, STRU, MODE 50, 51, 52, 53, 54, 55
- 202 SITE 101
- 211 STAT 77
- HELP 78
- 212 STAT 77
- 213 STAT 77
- 214 HELP 78
- 220 REIN 63
- 221 QUIT 64
- 225 ABOR 71
- 226 ABOR 71
- 227 PASV 65
- 230 USER 60
- PASS 61
- ACCT 62
- 250 RNTO 70
- DELE 72
- CWD 73
- 331 USER 60
- 332 PASS 61
- 350 RNFR 69
- 425 RETR 120
- STOR 120
- APPE 118
- LIST 110
- NLST 111
- 450 RNFR 107
-
-
-
-
-
- FTP -4-
-
- 500 NOOP 200
- NLST 111
- 501 LIST 110
- NLST 111
- 502 REIN 108
- PASV 116
- ABOR 105
- STAT 104
- SITE 101
- 503 PASS 117
- ACCT 117
- RNTO 107
- 504 HELP 103
- TYPE, MODE, STRU 112, 113, 114
- SITE 101
- 530 USER 117
- PASS 117
- ACCT 117
- STOR 201
- 550 RETR 115
- APPE 118
- RNFR 107
- DELE 102
- CWD 106
- LIST 110
- NLST 111
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- FTP -5-
- FTP TEST SCENARIOS INDEX
-
- FTP TEST SCENARIO FILES
- versus
- FTP TEST NUMBERS
-
- Within the PROTOLAB VAX-11/750 Test Master System, all FTP test
- Scenario Files may be found in the following UNIX directory:
-
- /usr/users/TSL/test/scripts/ftp.
-
- The following table shows, for each FTP Test Number, the UNIX
- filenames of the FTP test Scenario Files in which it may be
- regarded as a "principal test objective". A Test Number may be
- used, to establish necessary predecessor conditions for other
- Test Numbers, in Scenario Files not indicated here.
-
- Test Number Scenario File
- -------------------- --------------------------------------------------
-
- u_logquit
- 1
- 2
- 9 u_basic
- 18
- 19
- 20
- 24 u_fileserv
- 10
- 25
- 26
- 22
- 23
- 21
- 20
- 3 u_connserv
- 4
- 31 u_conn3
- 32
- 60 s_logquit
- 61
- 62
- 64
- 66 s_basic
- 50
- 51
- 52
- 53
- 54
- 55
- 79
-
-
-
-
-
-
- FTP -6-
- 67 g_fileserv
- 68
- 69
- 70
- 74
- 75
- 73
- 72
- 63 s_connserv
- 71
- 77
- 76
- 78 s_connserv
- 65 s_conn3
- 200 n_generr
- 201 n_notlog
- 117
- 120 n_basic
- 114
- 112
- 113
- 118
- 107 n_fileserv
- 110
- 111
- 106
- 102
- 108 n_connserv
- 105
- 104
- 101
- 103
- 116 n_conn3
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- FTP -7-
- FTP SCENARIOS AND TESTS DESCRIPTIONS
-
- The following scenario files test the ability of the User FTP
- Implementation Under Test to issue commands according to the
- MIL-STD specification.
-
- Scenario File u_logquit:
- - Establish FTP Command Connection.
- - Login Sequence.
- - Close Command Connection.
-
- Test 1 Establish Connection
- Issue USER, PASS, and ACCT Commands
-
- Test 2 Issue QUIT Command
-
- -------------------------------------------------------
-
- Test 1
-
- - Can the implementation under test (IUT) establish
- a connection to the reference (REF)?
-
- - Can the IUT issue correct command formats for the
- USER, PASS, and ACCT commands?
-
- Establish Connection
-
- - Action: Instruct the IUT to open a connection to the
- REF: If successful, issue login sequence, else abort the
- scenario.
-
- - Verification: IUT receives a correct response from REF
- indicating that a connection is established.
-
- Success: Positive response received by IUT. Connection
- opened.
-
- Failure: Negative response received. No connection
- available. Abort Scenario.
-
- Login Sequence
-
- - Action: Instruct the IUT to issue the USER command. If
- the USER command is successful, the IUT is instructed to
- issue the PASS command. If the PASS command is
- successful, the IUT is instructed to issue the ACCT
- command.
-
- - Verification: REF compares char string received from
- IUT to the correct command format as specified by
- MIL-STD-1780.
-
- Success: REF receives correct command format for each the
- USER, PASS, and ACCT commands within the specified time
- interval for each command.
-
-
- FTP -8-
- Failure: If either an incorrect command is received or
- timeout occurs for any command, failure is logged and the
- test exited.
-
- Test 2
-
- - Can a connection between the IUT and REF be closed by
- issuing a QUIT command?
-
- - Action: The IUT is instructed to send the QUIT command.
-
- The REF waits 30 seconds to receive the command before
- timing-out.
-
- - Verification: REF receives character string and
- compares it to the MIL-STD specification for QUIT command.
-
- Success: IUT sent correct command format. Connection is
- closed.
-
- Failure: REF times-out before receiving the correct
- command format. Test is completed and connection is
- closed.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- FTP -9-
- Scenario File u_basic:
- - Issue Transfer Commands.
- - Test for correct file transfer.
- - Issue and test all possible combinations of the File
- Transfer Parameters.
-
- Test 9 Issue RETR and STOR commands
-
- ????A
- ????B
-
- Transfer a file and compare byte-by-byte for alteration of data
-
- Test 18, 19, 20 Issue all combinations of TYPE, MODE, and STRU
- transfer parameters.
- For each combination, transfer a file and
- compare byte-by-byte for alteration of data
-
- Test 8 Issue NOOP Command
-
- --------------------------------------------------------------------------
-
- Test 9
-
- - Can the IUT issue correct command formats for the RETR
- and STOR commands?
-
- - Can the IUT correctly transfer a file under the default
- transfer parameters?
-
- - Action: Instruct IUT to issue the RETR command so that
- a test file is transferred from the REF to IUT. If REF
- receives correct command format within 30 seconds, ensure
- file transfer is complete by checking response code. When
- file transfer has completed, instruct IUT to issue the
- STOR command so that the test file is transferred back to
- the REF. If REF receives correct command format within 30
- seconds, ensure file transfer is complete by checking
- response code. When file transfer has completed compare
- the original REF test file to the file just received by IUT.
-
- - Verification: Check the command format for MIL-STD
- conformance. Compare file to ensure that the file data
- was not destroyed or altered while being transferred to
- and from the IUT.
-
- Success: REF receives correct command format for RETR and
- STOR commands. Successful file comparison to ensure
- correct file transfer.
-
- Failure: Timeout occurs before receiving correct command
- format for either RETR or STOR commands or unsuccessful
- comparison of transferred files.
-
-
-
- FTP -10-
- Tests 18, 19, 20
-
- - Can the IUT issue all the possible values for the
- transfer parameter commands?
-
- - Can the IUT transfer a file using all the different
- combinations of the transfer parameters?
-
- - Action: These tests cover each possible combination of
- the transfer parameters. After each combination, there is
- a test for command format. If that test is successful, a
- file is transferred from the IUT to the REF and compared
- to the original file on the REF.
-
- - Verification: Check the MIL-STD for command format
- conformance. Compare file to ensure correct data and file
- representation.
-
- Success: For each test, a correct command format is
- received by REF and file comparison is successful.
-
- Failure: For each test, if a timeout occurs before
- receiving correct command format or an unsuccessful file
- comparison.
-
- Test 8
-
- - Can the IUT issue the correct command format for the
- NOOP command?
-
- - Action: Instruct IUT to issue the NOOP command. REF
- waits 30 seconds to receive correct command format from
- IUT.
-
- - Verification: REF checks that string received conforms
- to MIL-STD specifications.
-
- Success: REF receives correct command format within 30
- seconds.
-
- Failure: REF timed-out before receiving correct command
- format from the IUT.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- FTP -11-
- Scenario File u_fileserv: Test command formats for the following
- functions:
- - Append.
- - Allocate.
- - Rename file.
- - List files.
- - List files by name.
- - Change working directory.
- - Delete.
-
- Test 24: Issue APPE Command
- Test 10: Issue ALLO Command
- Test 25: Issue RNFR Command
- Test 26: Issue RNTO Command
- Test 22: Issue LIST Command
- Test 23: Issue NLST Command
- Test 21: Issue CWD Command
- Test 20: Issue DELE Command
-
-
- -----------------------------------------------------------------
-
- Test 24
-
- - Can the IUT issue an APPE command?
-
- - Action: IUT is instructed to issue an APPE command.
-
- - Verification: REF receives char string within 30 second
- time interval and checks it for MIL-STD specification.
-
- Success: IUT sends correct command format.
-
- Failure: REF does not receive correct command format
- within 30 seconds.
-
-
- Test 10
-
- - Can the IUT issue an ALLO command?
-
- - Action: IUT is instructed to issue an ALLO command.
-
- - Verification: REF receives char string within 30 second
- time interval and checks it for MIL-STD specification.
-
- Success: IUT sends correct command format.
-
- Failure: REF does not receive correct command format
- within 30 seconds.
-
-
-
-
-
-
- FTP -12-
- Test 25
-
- - Can the IUT issue a RNFR command?
-
- - Action: IUT is instructed to issue a RNFR command.
-
- - Verification: REF receives char string within 30 second
- time interval and checks it for MIL-STD specification.
-
- Success: IUT sends correct command format.
-
- Failure: REF does not receive correct command format
- within 30 seconds.
-
-
- Test 26
-
- - Can the IUT issue a RNTO command?
-
- - Action: IUT is instructed to issue a RNTO command.
-
- - Verification: REF receives char string within 30 second
- time interval and checks it for MIL-STD specification.
-
- Success: IUT sends correct command format.
-
- Failure: REF does not receive correct command format
- within 30 seconds.
-
-
- Test 22
-
- - Can the IUT issue a LIST command?
-
- - Action: IUT is instructed to issue a LIST command.
-
- - Verification: REF receives char string within 30 second
- time interval and checks it for MIL-STD specification.
-
- Success: IUT sends correct command format.
-
- Failure: REF does not receive correct command format
- within 30 seconds.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- FTP -13-
- Test 23
-
- - Can the IUT issue a NLST command?
-
- - Action: IUT is instructed to issue a NLST command.
-
- - Verification: REF receives char string within 30 second
- time interval and checks it for MIL-STD specification.
-
- Success: IUT sends correct command format.
-
- Failure: REF does not receive correct command format
- within 30 seconds.
-
-
- Test 21
-
- - Can the IUT issue a CWD command?
-
- - Action: IUT is instructed to issue a CWD command.
-
- - Verification: REF receives char string within 30 second
- time interval and checks it for MIL-STD specification.
-
- Success: IUT sends correct command format.
-
- Failure: REF does not receive correct command format
- within 30 seconds.
-
-
- Test 20
-
- - Can the IUT issue a DELE command?
-
- - Action: IUT is instructed to issue a DELE command.
-
- - Verification: REF receives char string within 30 second
- time interval end checks it for MIL-STD specification.
-
- Success: IUT sends correct command format.
-
- Failure: REF does not receive correct command format
- within 30 seconds.
-
-
-
-
-
-
-
-
-
-
-
-
-
- FTP -14-
- Scenario File u_connserv: Test command formats for the following
- functions:
- - Reinitialize connection.
- - Abort connection.
- - Status connection.
- - Site command.
- - Remote help information.
-
- Test 3 Issue REIN command
- Test 4 Issue ABOR command
- Test 6 Issue STAT command
- Test 7 Issue SITE command
- Test 5 Issue HELP command
-
- -------------------------------------------------------------
-
- Test 3
-
- - Can the IUT issue a REIN command?
-
- - Action: IUT is instructed to issue a REIN command.
-
- - Verification: REF receives char string within 30 second
- time interval and checks it for MIL-STD specification.
-
- Success: IUT sends correct command format.
-
- Failure: REF does not receive correct command format
- within 30 seconds.
-
-
- Test 4
-
- - Can the IUT issue a ABOR command?
-
- - Action: IUT is instructed to issue a ABOR command.
-
- - Verification: REF receives char string within 30 second
- time interval and checks it for MIL-STD specification.
-
- Success: IUT sends correct command format.
-
- Failure: REF does not receive correct command format
- within 30 seconds.
-
-
-
-
-
-
-
-
-
-
-
-
- FTP -15-
- Test 6
-
- - Can the IUT issue a STAT command?
-
- - Action: IUT is instructed to issue a STAT command.
-
- - Verification: REF receives char string within 30 second
- time interval and checks it for MIL-STD specification.
-
- Success: IUT sends correct command format.
-
- Failure: REF does not receive correct command format
- within 30 seconds.
-
-
- Test 7
-
- - Can the IUT issue a SITE command?
-
- - Action: IUT is instructed to issue a SITE command.
-
- - Verification: REF receives char string within 30 second
- time interval and checks it for MIL-STD specification.
-
- Success: IUT sends correct command format.
-
- Failure: REF does not receive correct command format
- within 30 seconds.
-
-
- Test 5
-
- - Can the IUT issue a HELP command?
-
- - Action: IUT is instructed to issue a HELP command.
-
- - Verification: REF receives char string within 30 second
- time interval and checks it for MIL-STD specification.
-
- Success: IUT sends correct command format.
-
- Failure: REF does not receive correct command format
- within 30 seconds.
-
-
-
-
-
-
-
-
-
-
-
-
-
- FTP -16-
- Scenario File u_conn3:
- - This scenario tests the ability of the User FTP
- process to communicate with two servers at once.
- - It also tests its ability issue the PASV and PORT
- commands.
-
- Test 31 Issue PASV command
- Test 32 Issue PORT command
-
-
- -----------------------------------------------------------------------------
-
-
- Test 31
-
- - Can the IUT issue a PASV command?
-
- - Action: IUT is instructed to issue a PASV command.
-
- - Verification: REF receives char string within 30 second
- time interval and checks it for MIL-STD specification.
-
- Success: IUT sends correct command format.
-
- Failure: REF does not receive correct command format
- within 30 seconds.
-
-
- Test 32
-
- - Can the IUT issue a PORT command?
-
- - Action: IUT is instructed to issue a PORT command.
-
- - Verification: REF receives char string within 30 second
- time interval and checks it for MIL-STD specification.
-
- Success: IUT sends correct command format.
-
- Failure: REF does not receive correct command format
- within 30 seconds.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- FTP -17-
- The following scenario files test the ability of the Server FTP
- Implementation Under Test to respond to commands issued by the
- Reference User Implementation in accordance to the MIL-STD
- specification.
-
- Scenario File s_logquit:
- - Establish FTP Command Connection.
- - Login Sequence.
- - Close Command Connection.
-
- Test 1 Open connection to IUT
- Test 60 Test response to USER command
- Test 61 Test response to PASS command
- Test 62 Test response to ACCT command
- Test 64 Test response to QUIT command
-
- --------------------------------------------------
-
- Test 1
-
- - Can the implementation under test (IUT) establish a
- connection with the reference implementation (REF)?
-
- - Action: REF tries opening a connection to IUT.
-
- - Verification: REF receives a 220 response within 30
- seconds indicating that command channel is open.
-
- Success: REF receives response code of 220. Connection
- is established.
-
- Failure: REF times-out waiting for correct response code
- from IUT. Connection cannot be established, scenario is
- aborted.
-
-
- Test 60
-
- - Does the IUT correctly implement the USER command?
-
- - Action: REF sends the IUT the USER command and waits 30
- seconds for IUT to respond.
-
- - Verification: REF checks for valid codes of 230, 331,
- or 332.
-
- Success: REF receives one of the valid response codes.
-
- Failure: REF times-out waiting for IUT to respond with a
- valid response code. Scenario is aborted and all
- connections are closed.
-
-
- Test 61
-
- - Does the IUT correctly implement the PASS command?
-
- FTP -18-
- - Action: REF sends the IUT the PASS command and waits 30
- seconds for IUT to respond.
-
- - Verification: REF checks for valid codes of 230 or 332.
-
- If the response code 202 or 503 is received, the command
- is not implemented and the test is not evaluated for
- success or failure.
-
- Success: REF receives one of the valid response codes.
-
- Failure: REF times-out waiting for IUT to respond with a
- valid response code.
-
-
- Test 62
-
- - Does the IUT correctly implement the ACCT command?
-
- - Action: REF sends the IUT the ACCT command and waits 30
- seconds for IUT to respond.
-
- - Verification: REF checks for valid code of 230.
-
- If the response code 202 is received, the command is not
- implemented and the test is not evaluated for success or
- failure.
-
- Success: REF receives a valid response codes.
-
- Failure: REF times-out waiting for IUT to respond with a
- valid response code.
-
-
- Test 64
-
- - Does the IUT correctly implement the QUIT command?
-
- - Action: REF sends the IUT the ACCT command and waits 30
- seconds for IUT to respond.
-
- - Verification: REF checks for valid code of 221.
-
- Success: REF receives a valid response code.
-
- Failure: REF times-out waiting for IUT to respond with a
- valid response code. All connections are closed and test
- ends.
-
-
-
-
-
-
-
-
- FTP -19-
- Scenario File s_basic:
- - Test transfer commands.
- - Test for correct file transfer.
- - Issue and test all possible combinations of the file
- transfer parameters.
-
- Test 66 REF test responses to RETR and STOR commands and the
- IUT's capability to transfer a file.
-
- Tests 50-55 REF tests the response codes for all possible
- combinations of transfer parameters TYPE, MODE, and
- STRU and the IUT's capability to transfer a file for
- each combination.
-
- Test 79 Test response to NOOP command.
-
- ---------------------------------------------------------------------
-
- Test 66
-
- - Can the IUT correctly respond to the RETR and STOR
- commands?
-
- - Does the IUT correctly implement the RETR and STOR
- commands?
-
- - Action: REF sends the IUT the STOR command so that a
- file is transferred from the REF to the IUT and waits 30
- seconds for IUT to respond. The following are valid
- responses: 150 and 226, 125 and 226, 150 and 250, or 125
- and 250. If the REF does not receive a valid response
- from the IUT, the entire scenario is aborted. However, if
- the REF receives a valid response, it will then send the
- RETR command to transfer the test file back from the IUT.
- If the REF receives a valid response from the IUT to the
- RETR command, the file transfer has completed. To ensure
- the IUT performed the file transfer function correctly,
- the test file received from the IUT is compared to the
- original test file on the REF.
-
- - Verification: REF checks for valid response codes for
- RETR and STOR commands. File comparison ensures that the
- file data was not destroyed or altered while being
- transferred by or stored on the IUT.
-
- Success: REF receives correct response codes for RETR and
- STOR commands. Successful file comparison to ensure
- correct file transfer.
-
- Failure: Timeout occurs before receiving correct response
- codes for either RETR or STOR commands or unsuccessful
- comparison of files.
-
-
-
-
-
- FTP -20-
- Tests 50-55
-
- - Can the IUT respond to all possible values of transfer
- parameter commands.
-
- - Can the IUT transfer a file for each different
- combination of the transfer parameters.
-
- - Action: These tests cover each possible combination of
- the transfer parameters. For each combination there is a
- test for a valid response code of 200. A response code of
- 502 or 504 indicates the specified value for that transfer
- parameter command is not implemented and does neither
- succeed or fail. For each test that meets the valid
- response, a file is transferred from the IUT to REF and
- compared to the original file on the REF.
-
- - Verification: REF checks for valid response code and
- compares file to ensure correct data and file
- representation.
-
- Success: For each test, a valid response is received by
- REF and file comparison is successful.
-
- Failure: For each test, if a timeout occurs before
- receiving a valid response or an unsuccessful file
- comparison.
-
-
- Test 79
-
- - Can the IUT correctly respond to the NOOP command?
-
- - Action: REF sends the IUT the NOOP command.
-
- - Verification: REF checks for a valid response code of
- 200 within 30 seconds.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out before receiving a valid code.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- FTP -21-
- Scenario File s_fileserv: Test responses and functional ability
- of the following file-related commands:
- - Append.
- - Allocate.
- - Rename From.
- - Rename To.
- - List file information.
- - List file names.
- - Change working directory.
- - Delete a file.
-
- Test 67 Test response to APPE command
- Test 68 Test response to ALLO command
- Test 69 Test response to RNFR command
- Test 70 Test response to RNTO command
- Test 74 Test response to LIST command
- Test 75 Test response to NLST command
- Test 73 Test response to CWD command
- Test 72 Test response to DELE command
-
- --------------------------------------------------------
-
- Test 67
-
- - Does the IUT correctly respond to and implement the APPE command?
-
- - Action: REF sends the IUT the APPE command and waits 60
- seconds for the IUT to respond. The first part of the test
- is for appending onto an already existing file. The second
- part of the test is for appending onto a non-existing file,
- thereby creating a new file. The second part of the test
- checks that a new file is created.
-
- - Verification: REF checks for a valid code of 150 and
- 226, 125 and 226, 150 and 250, 125 and 250. A response
- code of 502 indicates the command is not implemented and
- the test is not evaluated for success or failure.
-
- Success: REF receives valid response codes and
- successfully creates new file for the second part of the
- test.
-
- Failure: REF times-out before receiving valid response or
- does not create file for second part of test.
-
-
- Test 68
-
- - Does the IUT correctly respond to and implement the ALLO command?
-
- - Action: REF sends the IUT the ALLO command and waits 60
- seconds for the IUT to respond. The first part of the test
- is for allocating an additional number of bytes of storage
- for a file to be stored on the recipient's host. The
- second part of the test is for allocating enough records
- for a file that will be stored as records.
-
- FTP -22-
- - Verification: REF checks for a valid code of 200. A
- response code of 202 or 504 indicates the command is not
- implemented and the test is not evaluated for success or
- failure.
-
- Success: REF receives a valid response code.
-
- Failure: REF times-out before receiving a valid response.
-
-
- Test 69
-
- - Does the IUT correctly respond to and implement the RNFR
- command?
-
- - Action: REF sends the IUT the RNFR command and waits 30
- seconds for the IUT to respond.
-
- - Verification: REF checks for a valid code of 350. A
- response code of 502 indicates the command is not
- implemented and the test is not evaluated for success or
- failure.
-
- Success: REF receives a valid response code.
-
- Failure: REF times-out before receiving a valid response.
-
-
- Test 70
-
- - Does the IUT correctly respond to and implement the RNTO command?
-
- - Action: REF sends the IUT the RNTO command and waits 30
- seconds for the IUT to respond.
-
- - Verification: REF checks for a valid code of 250 or 200.
- A response code of 502 indicates the command is not
- implemented and the test is not evaluated for success or
- failure.
-
- Success: REF receives a valid response code.
-
- Failure: REF times-out before receiving a valid response.
-
-
- Test 74
-
- - Does the IUT correctly respond to and implement the LIST command?
-
- - Action: REF sends the IUT the LIST command and waits 60
- seconds for the IUT to respond.
-
- - Verification: REF checks for a valid code of 125 and
- 226, 125 and 250, 150 and 226, or 150 and 250. A response
- code of 502 indicates the command is not implemented and
- the test is not evaluated for success or failure.
-
- FTP -23-
- Success: REF receives a valid response code.
-
- Failure: REF times-out before receiving a valid response.
-
-
- Test 75
-
- - Does the IUT correctly respond to and implement the NLST command?
-
- - Action: REF sends the IUT the NLST command and waits 60
- seconds for the IUT to respond.
-
- - Verification: REF checks for a valid code of 125 and
- 226, 125 and 250, 150 and 226, or 150 and 250. A response
- code of 502 indicates the command is not implemented and
- the test is not evaluated for success or failure.
-
- Success: REF receives a valid response code.
-
- Failure: REF times-out before receiving a valid response.
-
-
- Test 73
-
- - Does the IUT correctly respond to and implement the CWD command?
-
- - Action: REF sends the IUT the CWD command and waits 30
- seconds for the IUT to respond.
-
- - Verification: REF checks for a valid code of 250 or 200.
- A response code of 502 indicates the command is not
- implemented and the test is not evaluated for success or
- failure.
-
- Success: REF receives a valid response code.
-
- Failure: REF times-out before receiving a valid response.
-
-
- Test 72
-
- - Does the IUT correctly respond to and implement the DELE command?
-
- - Action: REF sends the IUT the DELE command and waits 30
- seconds for the IUT to respond.
-
- -Verification: REF checks for a valid code of 250 or 200.
- A response code of 502 indicates the command is not
- implemented and the test is not evaluated for success or
- failure. If a valid response is received, the REF tries to
- retrieve the same file to ensure it was deleted.
-
- Success: REF receives a valid response code.
-
- Failure: REF times-out before receiving a valid response.
-
- FTP -24-
- Scenario File s_connserv: Test IUT's response for the following
- functions:
- - Reinitialize Connection.
- - Abort Connection.
- - Status of connection.
- - Site Command.
- - Remote Help information.
-
- Test 63 Test response to REIN Command
- Test 71 Test response to ABOR Command
- Test 77 Test response to STAT Command
- Test 76 Test response to SITE Command
- Test 78 Test response to HELP Command
-
- -----------------------------------------------------------------------------
-
-
- Test 63
-
- - Does the IUT correctly respond to the REIN command?
-
- - Action: REF sends the REIN command and waits 30 seconds
- for the IUT to respond.
-
- - Verification: REF checks for a valid response code of
- 120 or 220. A response code of 502 indicates the command
- is not implemented and the test is not evaluated for
- success or failure.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out before receiving valid response.
-
-
- Test 71
-
- - Does the IUT correctly respond to the ABOR command?
-
- - Action: REF sends the ABOR command and waits 30 seconds
- for the IUT to respond.
-
- - Verification: REF checks for a valid response code of
- 225 or 226. A response code of 502 indicates the command
- is not implemented and the test is not evaluated for
- success or failure.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out before receiving valid response.
-
-
-
-
-
-
-
-
- FTP -25-
- Test 77
-
- - Does the IUT correctly respond to the STAT command?
-
- - Action: REF sends the STAT command and waits 30 seconds
- for the IUT to respond.
-
- - Verification: REF checks for a valid response code of
- 211, 212, or 213 (depending on the parameter sent with the
- STAT command). A response code of 502 indicates the
- command is not implemented and the test is not evaluated
- for success or failure.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out before receiving valid response.
-
-
- Test 76
-
- - Does the IUT correctly respond to the SITE command?
-
- - Action: REF sends the SITE command and waits 30 seconds
- for the IUT to respond.
-
- - Verification: REF checks for a valid response code of
- 200. A response code of 202 or 502 indicates the command
- is not implemented and the test is not evaluated for
- success or failure.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out before receiving valid response.
-
-
- Test 78
-
- - Does the IUT correctly respond to the HELP command?
-
- - Action: REF sends the HELP command and waits 30 seconds
- for the IUT to respond.
-
- - Verification: REF checks for a valid response code of
- 211 or 214. A response code of 502 indicates the command
- is not implemented and the test is not evaluated for
- success or failure.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out before receiving valid response.
-
-
-
-
-
-
- FTP -26-
- Scenario File s_conn3:
- - This scenario exercises the ability of the IUT
- server to communicate and transfer files in a 3-party
- transfer.
- - The third party, other than the REF User and IUT
- Server, is the REF Server.
-
- Test 65 Conduct file transfer activity between User and both
- Servers by using PASV and PORT commands.
-
- ---------------------------------------------------------------------
-
- Test 65
-
- - Can the IUT respond to commands necessary for a 3-party
- file transfer?
-
- - Does the IUT function properly as a server within a 3
- party file transfer?
-
- - Action: A command connection is established between REF
- User and REF Server. Then a connection is established
- between REF User and IUT Server. If either of these
- connections cannot be established, the scenario is aborted
- (REF User has the ability to switch between the two
- connections). The test begins by sending the PASV command
- to the REF Server. It should respond with the response
- code 227 to indicate that it is listening for a data
- connection to be established to it, along with the data
- port number to which the other server should connect.
- Next, the REF User issues the RETR command to the REF
- Server so it knows its function when the data connection is
- established. It should respond with a code of 150. After
- the REF User receives this response, it switches to its
- connection with the IUT Server and issues the PORT command
- specifying the data port number received on the PASV
- response. The IUT should respond with the valid response
- code of 200. When the REF receives this code, it issues
- the IUT the STOR command so that a test file may be
- transferred from the REF site to the IUT site. This test
- completes one file transfer, but in order to verify that
- data was not destroyed or altered by the IUT server, the
- test file is transferred back to the REF and compared to
- the initial file.
-
- - Verification: REF checks for valid response codes from
- the IUT for the PORT command and the transfer commands and
- compares the transferred file with the original file to
- ensure data and file representation.
-
- Success: REF receives correct response codes and
- successful comparison of files.
-
- Failure: REF does not receive correct response codes or
- unsuccessful comparison of files.
-
-
- FTP -27-
- The following scenarios test the ability of the IUT Server to
- correctly respond to erroneous situations. Each test will set up
- an error for a given command and check that the IUT responds
- appropriately.
-
- Scenario File n_notlog:
- - Test issuing a command before the user is logged in.
- - Test USER command given an unknown username.
- - Test login sequence giving a bad sequence of
- commands.
- - Test PASS command given a known user but an
- incorrect password.
-
- Test 201 Test negative response for user not logged in.
- Test 117 Test negative response for unknown user, bad login
- sequence, and an incorrect password.
-
- -------------------------------------------------------------------
-
-
- Test 201
-
- - Can the IUT respond correctly to the STOR command before
- the user has logged in?
-
- - Action: REF User establishes a connection with the IUT
- but does not log in. The REF User issues a STOR command
- and waits 30 seconds for the IUT to respond.
-
- - Verification: REF checks for valid response of 530 from
- the IUT.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out before receiving.
-
-
- Test 117a
-
- - Can the IUT respond correctly to an unknown username?
-
- - Action: REF issues a USER command to the IUT with an
- invalid username and waits 30 seconds for the IUT to
- respond.
-
- - Verification: REF checks for valid response of 530 from
- the IUT.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out before receiving.
-
-
- Test 117b
-
- - Can the IUT respond correctly to a bad sequence of
- commands giving the ACCT command?
-
- FTP -28-
- - Action: REF issues an ACCT command out of sequence to
- the IUT and waits 30 seconds for the IUT to respond.
-
- - Verification: REF checks for valid response of 503 from
- the IUT. A response code of 502 indicates the ACCT
- command is not implemented and the test is not evaluated
- for success or failure.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out before receiving.
-
-
- Test 117c
-
- - Can the IUT respond correctly to a bad sequence of
- commands giving the PASS command?
-
- - Action: REF issues an PASS command out of sequence to
- the IUT and waits 30 seconds for the IUT to respond.
-
- - Verification: REF checks for valid response of 503 from
- the IUT.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out before receiving.
-
-
- Test 117d
-
- - Can the IUT respond correctly to a correct username
- ising the USER command, but an invalid password using the
- PASS command?
-
- - Action: REF issues a USER command with a valid username
- and if the IUT responds correctly, REF then issues a PASS
- command with an invalid password. REF waits 30 seconds
- for the IUT to respond.
-
- - Verification: REF checks for valid response of 530 from
- the IUT indicating user has not logged in correctly. User
- must then re-initiate login sequence.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out before receiving.
-
-
-
-
-
-
-
-
-
-
-
- FTP -29-
-
- Scenario File n_generr:
- - Test a command for general syntax error.
-
- Test 200 Test for correct response to an incorrectly spelled NOOP Command
-
- ----------------------------------------------------------------------------
-
- Test 200
-
- - Can the IUT respond correctly to a syntax error on
- command line?
-
- - Action: REF issues a misspelled NOOP command and waits
- 30 seconds for IUT to respond.
-
- - Verification: REF checks for a valid response of 500
- indicating a syntax error.
-
- Success: REF receives valid response from IUT.
-
- Failure: REF times-out waiting for response from IUT.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- FTP -30-
- Scenario File n_basic:
- Test IUT to respond correctly to errors when issuing
- transfer commands and transfer parameter commands.
-
- Test 120 Test IUT responds correctly to RETR and STOR commands
- which cannot open data connections.
- Test responses to transfer commands for non-existent file.
-
- Test 114 Test IUT response to a STRU command with an
- unimplemented value.
-
- Test 112 Test IUT response to a TYPE command with an
- unimplemented value.
-
- Test 113 Test IUT response to a MODE command with an
- unimplemented value.
-
- -------------------------------------------------------------------
-
- Test 120a
-
- - Does the IUT respond correctly to a STOR command which
- cannot open a data connection?
-
- - Action: REF issues a STOR command for which a data
- connection cannot be opened and waits 10 seconds for the
- IUT to respond.
-
- - Verification: REF checks that a valid response of 425
- is received indicating that a connection cannot be opened.
-
- Success: REF receives correct response code.
-
- Failure: REF times-out before receiving correct response code.
-
-
- Test 120b
-
- - Does the IUT respond correctly to a RETR command which
- cannot open a data connection?
-
- - Action: REF issues a RETR command for which a data
- connection cannot be opened and waits 10 seconds for the
- IUT to respond.
-
- - Verification: REF checks that a valid response of 425
- is received indicating that a connection cannot be opened.
-
- Success: REF receives correct response code.
-
- Failure: REF times-out before receiving correct response code.
-
-
- Test 120c
-
- - Does IUT respond correctly when asked to retrieve a non
- existent file.
-
- FTP -31-
- - Action: REF issues a RETR command giving a non-existent
- filename and waits 10 seconds for a valid response from the IUT.
-
- - Verification: REF checks that a valid response of 550 is received
- from IUT indicating that the file specified does not exist.
-
- Success: REF receives a valid response code.
-
- Failure: REF times-out before receiving correct response code.
-
- Test 114
-
- - Can the IUT respond correctly to the STRU command given
- an unimplemented value?
-
- - Action: REF issues STRU command giving an unimplemented
- value and waits 10 seconds for a valid response from IUT.
-
- - Verification: REF checks for a valid response of 502 or
- 504 indicating that command is not implemented for that
- parameter value.
-
- Success: REF receives correct response code.
-
- Failure: REF times-out before receiving valid response code.
-
- Test 112
-
- - Can the IUT respond correctly to the TYPE command given
- an unimplemented value?
-
- - Action: REF issues TYPE command giving an unimplemented
- value and waits 10 seconds for a valid response from IUT.
-
- - Verification: REF checks for a valid response of 502 or
- 504 indicating that command is not implemented for that
- parameter value.
-
- Success: REF receives correct response code.
-
- Failure: REF times-out before receiving valid response code.
-
- Test 113
-
- - Can the IUT respond correctly to the MODE command given
- an unimplemented value?
-
- - Action: REF issues MODE command giving an unimplemented
- value and waits 10 seconds for a valid response from IUT.
-
- - Verification: REF checks for a valid response of 502 or
- 504 indicating that command is not implemented for that
- parameter value.
-
- Success: REF receives correct response code.
-
- Failure: REF times-out before receiving valid response code.
-
- FTP -32-
- Scenario File n_fileserv: Test error responses for the following
- functions:
- - Append.
- - Rename From.
- - Rename To.
- - List File Information.
- - List Files by Name.
- - Change Working Directory.
- - Delete File.
-
- Test 118 Test response to APPE command which cannot open a data
- connection.
-
- Test 107 Test the response to RNTO and RNFR commands. One part
- of the test tries to rename a non-existent filename.
- The other part of the test issues the RNTO command out
- of sequence.
-
- Test 110 Test response to LIST command which cannot open a data connection.
-
- Test 111 Test response to NLST command which cannot open a data connection.
-
- Test 106 Test response to CWD command for a non-existent directory.
-
- Test 102 Test response to DELE command for a non-existent file.
-
- --------------------------------------------------------------------
-
- Test 118
-
- - Does the IUT respond correctly to an APPE command which
- cannot open a data connection?
-
- - Action: REF issues an APPE command for which a data
- connection may not be opened and waits 10 seconds for the
- IUT to respond.
-
- - Verification: REF checks for a valid response code of
- 425 indicating it cannot open a data connection.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out before receiving valid response code.
-
-
- Test 107a
-
- - Can the IUT respond correctly to the RNFR command which
- tries to rename a non-existent file?
-
- - Action: REF issues a RNFR command with a non-existent
- filename and waits for a valid response from the IUT.
-
- - Verification: REF checks for a valid response code of
- 450 or 550 indicating that the file is unavailable.
-
-
- FTP -33-
- Success: REF receives valid response code.
-
- Failure: REF times-out waiting for a valid response code.
-
-
- Test 107b
-
- - Can the IUT respond correctly to the RNTO command which
- is out of sequence.
-
- - Action: REF issues a RNTO command which is out of
- sequence and waits for a valid response from the IUT.
-
- - Verification: REF checks for a valid response code of
- 503 indicating a bad sequence of commands.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out waiting for a valid response code.
-
-
- Test 110
-
- - Does the IUT respond correctly to an LIST command which
- cannot open a data connection?
-
- - Action: REF issues an LIST command for which a data
- connection may not be opened and waits 10 seconds for the
- IUT to respond.
-
- - Verification: REF checks for a valid response code of
- 425 or 501 indicating it cannot open a data connection.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out before receiving valid response code.
-
-
- Test 111
-
- - Does the IUT respond correctly to an NLST command which
- cannot open a data connection?
-
- - Action: REF issues an LIST command for which a data
- connection may not be opened and waits 10 seconds for the
- IUT to respond.
-
- - Verification: REF checks for a valid response code of
- 500, 425, or 501 indicating it cannot open a data
- connection.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out before receiving valid response code.
-
-
-
- FTP -34-
- Test 106
-
- - Can the IUT respond correctly to the CWD command which
- tries to change to a non-existent directory?
-
- - Action: REF issues a CWD command with a non-existent
- directory and waits for a valid response from the IUT.
-
- - Verification: REF checks for a valid response code of
- 550 indicating that the file is unavailable.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out waiting for a valid response code.
-
-
- Test 102
-
- - Can the IUT respond correctly to the DELE command which
- tries to delete a non-existent file?
-
- - Action: REF issues a DELE command with a non-existent
- filename and waits for a valid response from the IUT.
-
- - Verification: REF checks for a valid response code of
- 550 indicating that the file is unavailable.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out waiting for a valid response code.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- FTP -35-
- Scenario File n_connserv: Test IUT s_response
- functions:
- - Reinitialize connection.
- - Abort connection.
- - Status of connection.
- - Site command.
- - Remote help information.
-
- Test 108 Test negative response to REIN command.
- Test 105 Test negative response to ABOR command.
- Test 104 Test negative response to STAT command.
- Test 101 Test negative response to SITE command.
- Test 103 Test negative response to HELP command.
-
- -------------------------------------------------------------
-
- Test 108
-
- - Does the IUT respond correctly if the REIN command is
- not implemented?
-
- - Action: REF issues REIN command and waits 30 seconds
- for a valid response.
-
- - Verification: REF checks for a valid response of 502
- indicating command is not implemented.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out waiting for a valid response code.
-
-
- Test 105
-
- - Does the IUT respond correctly if the ABOR command is
- not implemented?
-
- - Action: REF issues ABOR command and waits 30 seconds
- for a valid response.
-
- - Verification: REF checks for a valid response of 502
- indicating command is not implemented.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out waiting for a valid response code.
-
-
- Test 104
-
- - Does the IUT respond correctly if the STAT command is
- not implemented?
-
- - Action: REF issues STAT command and waits 30 seconds
- for a valid response.
-
-
- FTP -36-
- - Verification: REF checks for a valid response of 502
- indicating command is not implemented.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out waiting for a valid response code.
-
-
- Test 101
-
- - Does the IUT respond correctly if the SITE command is
- not implemented?
-
- - Action: REF issues SITE command and waits 30 seconds
- for a valid response.
-
- - Verification: REF checks for a valid response of 202,
- 502, or 504 indicating command is not implemented.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out waiting for a valid response code.
-
-
- Test 103
-
- - Does the IUT respond correctly if the HELP command
- giving an unknown parameter?
-
- - Action: REF issues HELP command with an unknown
- parameter and waits 30 seconds for a valid response.
-
- - Verification: REF checks for a valid response of 504
- indicating command is not implemented for that parameter.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out waiting for a valid response code.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- FTP -37
- Scenario File n_conn3:
- - Test if IUT responds correctly to an unimplemented
- PASV command.
-
- Test 116 Test that IUT's ability to respond correctly to an
- unimplemented PASV command.
-
- -----------------------------------------------------------------------------
-
- Test 116
-
- - Does the IUT respond correctly if the PASV command is
- not implemented?
-
- - Action: REF issues PASV command and waits 30 seconds
- for a valid response.
-
- - Verification: REF checks for a valid response of 502
- indicating command is not implemented.
-
- Success: REF receives valid response code.
-
- Failure: REF times-out waiting for a valid response code.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- FTP -38-
-